Customization: | Available |
---|---|
Material Grade: | Q235B/Q345b |
Painted: | Epoxy Primer/PU/Alkyd Paint/Epoxy Zinc Rich Primer |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item Name | steel structures for workshop warehouse hangar building |
Main Material | Q235/Q345 Welded H Beam and Hot Rolled Section Steel |
Surface | Painted or Hot Dip Galvanized |
Service | We can make quotation according to customer's drawing or requirement; (size by length/width/height and wind speed), offering a free design drawing and all detailed drawings for installation. |
Design, Fabrication and Installation | |
Design software: Auto CAD,PKPM,MTS,3D3S, Tarch, Tekla Structures(Xsteel)V12.0.etc | |
Packing | According to customer's requirement |
Load into 40/20GP,40HQ or 40OT |
1. Wide span: Single span or multiple spans, the max span is over 70 m without middle column.
2. Low cost: Unit price range from USD45/sqm to USD80/sqm according to customers' request.
3. Fast construction and easy installation.
4. Long using life: Up to 50 years.
5. Others: Environmental protection, stable structure, earthquake proofing, water proofing, and energy conserving.
With more than 35 years history, Wiskind has vast experiences in design, production, transportation and installation of steel building systems. We have been committed to providing customers with the most reasonable and economical solution, so that the customers can achieve steel building dream. Based on 35 years of development, we have a professional management team in steel structure design, production and installation, meanwhile, we continue to develop new technologies, new panels, and access to a number of national patents. The production management has obtained ISO9001 certification, roofing system products obtained FM certification.
In the past 35 years, Wiskind exports more than 50 countries and regions. We access to the praises of many customers for our high-quality steel construction products and professional services.
2.We have the Competitive Price
With over 35 years of experience in steel structure industry, Wiskind can provide the most reasonable and economical scheme to prevent over designs.
Long term partnerships with raw material product suppliers give us the ability to control quality and price effectively.
Large-scale production reduces our procurement, production and management costs, which can bring customers more economic benefits.
We produce both steel structure (frame) and wall and roof panels, reducing external sourcing, ensuring consistency in product quality and further saving on costs.
3.We have a high-efficiency design team to do drawing.
If you provide us the information about the building ,for example : snow load, wind load ,the grade of earthquake,you can get a piece of detailed drawing.
4.Vast Experience in the foreign projects
In the past 35 years, Wiskind's products are exported to more than 50 countries and regions, we have vast experience in design, transportation and overseas installation. Do not worry that you are far away from us, whether Asia, Oceania, America or Africa, we can provide installation workers or installation instructions according to customer needs for the project. For us, the end of a project is not you pay us to get the products, but you successfully complete the installation of our products.
4.Good Quality
Quality first, which is the key to our success in these years. We develop new technologies to improve the performance of our products, even if using the same raw materials, our products will be in more high quality.
5. Reputation
Our company have a good reputation and credibility in the industry. The customers that we have cooperated evaluate our company as follow, "This is a professional company, which has good service attitude, which really solves problem for customers, which can be trusted by the customers.It's a great thing to cooperate with such a company. You don't need to worry about the quality of the products, don't need to worry about the transport and installation.They will give you the most reasonable and economical design, transportation and installation plan"
<4> Packing & Shipping
(1)Packing the main frame steel structure components together with secondary parts by channnel tray and belt.
(2)Packing the purlin into the bundles by the steel strip
(3)packing the small parts by bags and EPS foam
(4)packing sets parts by some box
(5)Loading all the packages into the container.
<5>Delivery Time :
30 days after the deposit and confirm the drawing
<6>Payment Terms :
Payment : L/C or by T/T (30% Prepaid as deposit, the balance 70% before shipment)
If you are interested in our any products, pls kindly contact me !